MOOSE ZXSSD Información técnica Pagina 27

  • Descarga
  • Añadir a mis manuales
  • Imprimir
  • Pagina
    / 64
  • Tabla de contenidos
  • MARCADORES
  • Valorado. / 5. Basado en revisión del cliente
Vista de pagina 26
27
Communicator Test
Your system must be monitored by a Central Station
to perform this test. This test will take a while to
perform.
This test is used to verify that your system is communicating with the
Central Station.
To perform a communicator test:
1. Press . The Control Station will display:
2. Enter passcode: .
The Control Station will display:
3. Press . The Control Station will display:
4. If the test passes, the Control Station will sound four (4) beeps
when the test is completed. The Control Station will display:
If the test fails, a Communications Failure trouble condition results
several minutes later. The Control Station will display:
TESTING YOUR SYSTEM
8
NOTE
4
Vista de pagina 26
1 2 ... 22 23 24 25 26 27 28 29 30 31 32 ... 63 64

Comentarios a estos manuales

Sin comentarios